Supplier Information
- Position:
- Homepage >
- About SpeedTech >
- Supplier Information
Speedtech's Requirements for Suppliers of Raw Materials, Materials and Packaging Materials:
- Buy and sell targets, order confirmation, on-time delivery, delivery method and payment terms, delay liability, warranty liability, price discount and adjustment, delivery target, product packaging and labeling, product liability, confidentiality clause, intellectual property rights, force majeure Events, quality information, reliability, quality goals, quality assurance, quality abnormalities and corrective measures, manufacturing date and batch number control, material recognition, manufacturer assessment, obligation notification and other terms are mainly based on the purchase contract signed by the two parties.
- Parts for delivery, , packaging materials and other auxiliary materials must comply with SpeedTech 【Product Environmental Protection Specifications】 and 【Customer Environmental Management Substance Comparison List】environmental management Regulations of matter.
- The third unit test report provided by the supplier is updated once a year according to the inspection date. The latest valid test report should be provided one month in advance of the report expiration date and uploaded to SpeedTech GPM. If the supplier fails to upload and pass the review of the latest valid test report of SpeedTech GPM on the day when the report expires, the supplier is willing to bear the loss of line stoppage and expenses in SpeedTech due to the report expiration. All raw material analysis reports of the supplier shall comply with the regulations and requirements of SpeedTech, do not falsify or delay in providing the report, Once it is verified that the seller provides a false report, any loss in SpeedTech will be borne by the seller, supplier who delays in providing the report, SpeedTech has the right to ask the seller to stop supplying.
- Copper materials must be attached with 『Material Material Certificate』, if there is any change, the supplier shall be liable for compensation.
- Products that have been applied for by UL must be supplied in accordance with the specifications of the UL Plastic Material Warranty and must be attached with the 『Plastic Material Certificate』 when delivering. Duty to indemnify. (The scope includes raw material plastic pellets, semi-finished products, purchased semi-finished products and finished products, etc. The guarantee letter must cover the items provided by UL)
- Gold (Au), Tantalum (Ta), Tungsten (W), Cobalt (Co), Tin (Sn) Metals such as Gold (Au), Tantalum (Ta), Tungsten (W), Cobalt (Co), Tin (Sn) are not mined or mined by anarchists or illegal groups in conflict areas in the Democratic Republic of the Congo. Obtained through illegal smuggling. Do our best to source materials, refuse to use conflict minerals from conflict areas, and ensure that the metals contained in the products provided by SpeedTech meet the conflict-free regulations.
- Suppliers shall comply with the Responsible Business Alliance (RBA) to ensure a safe working environment, employees treated with respect and dignity, and business operations that are environmentally friendly and ethical.